DMG Blockchain

Partnering with DMG to build a site for cryptocurrency mining.  Organized delivery and installation for 85 MW substation at Christina Lake.  Project scope included the control center construction, 24 custom-built 2500 kVA substations, underground cabling, HV cabling, and the design and construction of the mining warehouse shelves and wiring.

Learn More

Diavik Diamond Mine

A work order for jumbo panels in 2010 turned into a long term business relationship between Diavik Diamond Mine and Boundary Electric.  The Northern Canadian mine knows and trusts in the quality of the product as well as the punctual delivery executed through the ice roads every year.

Learn More

Access Pipeline

Provided transformers to power site for the construction of the Access Pipeline in Alberta.  Custom-built 1500 kVA susbstations and delivered to site in Redwater, AB.

Learn More

Bitfury

Supplied and delivered power for Bitfury's sites in Drumheller and Three Hills, AB.  Created original design for power skids and worked with 25 KV splitters.  Boundary Electric is experienced in providing power solutions for digital currency mining.

Learn More

City of Surrey

Boundary Electric designed, supplied, and tested the secondary unit substation at Newton Pump Station for Translink in Surrey, B.C.  The substation was prepared with BC Hydro metering, load break switch and a 2000 kVA transformer.

Learn More

City of Grand Forks

The Flygt Concertor Pump is the first wastewater pump with integrated intelligence to be utilized in Canada.  Boundary Electric was contracted by the City of Grand Forks to supply and install the pump at City Park.  Boundary Electric is the proud supplier of Xylem and Flygt for the B.C. Kootenay area.

Learn More